By Category
Share your application parameters with us, and we’ll recommend the optimal solution.
FCom provides precision timing, frequency-control and RF/IF filtering solutions for aerospace, defense and mission-critical electronic systems.
Explore engineering cases covering low-G timing, IF selectivity, high-Q quartz resonators and custom RF front-end filtering.
Engineering Support
FCom supports timing, resonator and RF/IF component selection based on the subsystem architecture, operating environment and target performance.
Selected engineering cases show how timing, resonator, IF-filtering and RF-front-end requirements can be translated into application-specific frequency-control solutions.
Precision Timing
Reference timing engineered for mechanically dynamic platforms where acceleration, vibration and shock can directly affect frequency stability.
Low-G TCXO
Low g-Sensitivity
Vibration & Shock
Mission-Critical Communications
A common IF architecture using selectable crystal-filter responses to support multiple voice, modulation and data-channel profiles.
70 MHz-Class IF
Crystal Filter
High Rejection
High-IF Receiver Engineering
Filter-grade quartz resonators engineered around high-Q performance, overtone behavior and controlled equivalent-circuit characteristics.
High-Q Quartz
3rd Overtone
High-IF Filtering
RF Front End
Application-specific SAW filtering for UHF receiver front ends where center frequency, selectivity and package must align with the RF channel plan.
UHF
SAW Filter
RF Preselection
The recommendation starts with the complete subsystem and design requirements rather than selecting a part from frequency alone.
Review the application, target chipset, interfaces, operating environment and key design requirements.
Identify processor, PHY, FPGA, sensor, RF and RTC clock requirements across the subsystem.
Select the appropriate crystal, XO, TCXO or differential oscillator for each required clock function.
Confirm prototype samples, technical verification, qualification requirements and production considerations.
FCom supports architecture review, replacement evaluation, customization and project qualification based on the actual application requirements.
SYS
Review clock functions, device interfaces and performance priorities across the complete subsystem.
ALT
Compare an existing part against frequency, package, output, supply, stability, temperature and key electrical requirements.
ENG
Review non-standard frequency, stability, output, package or application-specific performance requirements.
QLT
Coordinate sample requirements, technical documentation and project-specific qualification considerations.
Send the original part number or datasheet. FCom can review the specification, package and electrical requirements to support replacement evaluation.